About
-
Viewed 36
Education
-
2011 - 2013
Southern Illinois University, Carbondale
Bachelor of Science (B.Sc.), Mechanical Engineering
Activities and societies: Vice President of Malaysian Student Assiociation at SIUC 2012 - Current
- 2008 - 2010
Experience
-
2018 - Present
JY Consult PLT
Senior Mechanical Engineer
• Lead M&E engineer for a mixed development consist of hotel, office, mall, and service apartments.
• Dealt with Chairman, CEO and Directors of public listed companies on a weekly basis.
• Engaged in technical discussions and monthly meetings with Marriott’s GDAP, FLS, MEP and GS&S.
• Attended and handled weekly CCMs, SMs & TCMs independently.
• Designed Performance Based Design (PBA) for Mall, and attended all BOMBA Putrajaya meetings.
• Obtained MSC Status for office tower.
• Obtained GreenRE Platinum for service apartment and Gold for commercial mixed development.
• Applied for Private Distribution License (PDL) with Suruhanjaya Tenaga and TNB for the client.
• Obtained authority approval e.g. TNB PPU, BOMBA, telco and etc.
• Gained in-depth knowledge on Strata requirements which affects M&E designs.
• Learned new security concept and requirement for mixed development. -
2014 - 2018
BGMC Corporation
Mechanical Engineer
Mechanical Design Experience
• Designed mechanical building services for a 3.28 Hectare of mixed-development in Medini, Johor which consist of a 4 star hotel, grade A office Tower, 2 Sofo Towers, mall, and an indoor sci-fi theme park.
• Analysed the heat load of a building using Carrier’s E20.
• Designed fire protection and plumbing systems
• Completed Silver design assessment for Non-Residential New Construction (NRNC) and submitted to Green Building Index (GBI).
• Reviewed sub-contractor’s shop drawing submission, material submission, request for information forms (RFI), and variation order.
• Reported engineering design to chief mechanical design engineer and director.
• Monitored and guided junior engineers, and drafters on mechanical design.
• Attended weekly coordination meetings with architect, civil & structure engineer, and interior designer. Project Management
• Managed Melawati Mall which have a contract sum of 38 million for electrical and extra low voltage services.
• Organized and prepared shop drawings, materials, method of statements, master work program, variation orders to consultant.
• Applied value engineering in shop drawings and project execution plan.
• Attended weekly nominated sub-contractor’s (NSC) meeting with client, consultant, and main contractor.
• Reported all project activities to project manager and director on all site matters.
• Monitored and guided sub-contractor’s progress work
• Communicated with sub-contractor effectively to ensure that the quality of finish work is to BGMC standards, and clients/consultant’s expectations. Contract & Tender Experiences
• Costed in all material and labour for medium voltage, Low voltage and extra low voltage tenders.
• Organized and work on tenders simultaneously to ensure that all tender datelines are met.
• Guided junior estimator on counting all the materials quantity.
• Finalized tenders with project director on the cost of material, cost of labour and profit margin.